首页切换大图5

Laboratory

Quality Control 

Incoming Raw Materials

Incoming raw material  must pass through the test before being used.

Semi-products

The parts must pass through the test before going into the next procedure.

Key part ——Exhalation valves are  100% testing.

Finished Products 

Finished product must be tested and proved to be qualified for delivery in conformity with standard and customer demands.


Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required